Verizon Phase I & II
Location: Alpharetta, Ga
Customer: JLJ Construction
Owner: Verizon
Type: New Construction

51 PCA Generator &UPS Replacement
Location: Atlanta, Ga
Eckardt completed two projects at this confidential telecommunications facility in downtown Atlanta. Eckardt replaced the existing emergency generator plant with 4 new 3000kW generators. Also replaced were the generator control switchboard and paralleling switchgear. Additionally, the existing UPS plant was removed and replaced with 3 new 1000kVA UPS modules, 3 battery strings, a battery monitoring system, UPS output switchgear, and power monitoring system.
This job required the installation and operation of a temporary generator plant on the small site footprint for the duration of the project. Eckardt’s team was honored with a 1st place Build Georgia Award from AGC Georgia for their excellent work on the job.
Customer: Jerry L Johnson & Associates
Owner: Confidential
Type: Renovation/Expansion
Contract: $15,000,000
Award: 2014 Build Georgia Award

Internet Data Center
Location: Lithia Springs, Ga
This project consisted of expanding the data center to include 28,000 square feet of raised access floor area and an additional 6,000 square feet of space for electrical infrastructure support systems.
Customer: Duffey Southeast
Owner: Confidential
Type: Renovation/Expansion
Contract: $24,000,000
Award: 2010 Build Georgia Award